Re: Who's got what left to do for B'Fest?
Posted: Thu Jun 17, 2010 11:27 pm
Well, you all know what I still have left to do. lol
I know, once the carpet is finished the interior will go together really quick! Gotta go get some quick drying adhesive to help pin it down to the floor. 3M Trim adhesive just isn't going to cut it enough for me. Remaining list:
Car:
Finish Carpet install.
Install rest of interior, including all trunk panels, deck panel, seat belts, seats, etc. Detail all of the interior thoroughly. Has to be done.
Remove or tie up alarm system. Time depending.
Install car stereo and subwoofer.
Purchase a fuse holder and a short bit of 6-8 gauge to go from the battery to the end of the wire I ran through the firewall.
If remote MIC arrives in time, install that for the BT Handsfree. (Radio has a mic but a remote will work better)
Install new steering wheel and airbag. Finally.
Go through and work on console, make sure its good to go.
Install the passenger side sun visor.
Pester Styluss to find the driver's side to match it that somehow he missed and sent me two passenger sides instead.
Mount tail light resistors into an aluminum panel and mount that to something in the trunk to disperse heat. NEEDS done.
Clean the spare, check the pressure, make sure all the trunk kit and stuff is installed.
Pack tool bag for emergency needs.
EDIT: Install the rear view mirror back on the windshield!
Once the interior stuff is completed and I get the parts...
Install new front wheel bearings.
Replace all brake drums and rotors.
Install new pads and shoes and rear brake parts.
Clean and lubricate the emergency cable.
Bleed all brakes thoroughly. Adjust emergency brake.
Change oil and top off anything else.
Change air filter.
Rotate tires and clean them very well, checking pressures, etc.
Detail the engine bay.
Polish the fillers, tail lights and headlights.
Clean the car, do a bit of polishing on the paint. (never been done completely yet since the paint job)
Detail the trims and plastics.
Should about do it for the car.
Also finish up all lighting projects for everyone.
And try to take care of any customers till I leave. :p
I know, once the carpet is finished the interior will go together really quick! Gotta go get some quick drying adhesive to help pin it down to the floor. 3M Trim adhesive just isn't going to cut it enough for me. Remaining list:
Car:
Finish Carpet install.
Install rest of interior, including all trunk panels, deck panel, seat belts, seats, etc. Detail all of the interior thoroughly. Has to be done.
Remove or tie up alarm system. Time depending.
Install car stereo and subwoofer.
Purchase a fuse holder and a short bit of 6-8 gauge to go from the battery to the end of the wire I ran through the firewall.
If remote MIC arrives in time, install that for the BT Handsfree. (Radio has a mic but a remote will work better)
Install new steering wheel and airbag. Finally.
Go through and work on console, make sure its good to go.
Install the passenger side sun visor.
Pester Styluss to find the driver's side to match it that somehow he missed and sent me two passenger sides instead.
Mount tail light resistors into an aluminum panel and mount that to something in the trunk to disperse heat. NEEDS done.
Clean the spare, check the pressure, make sure all the trunk kit and stuff is installed.
Pack tool bag for emergency needs.
EDIT: Install the rear view mirror back on the windshield!
Once the interior stuff is completed and I get the parts...
Install new front wheel bearings.
Replace all brake drums and rotors.
Install new pads and shoes and rear brake parts.
Clean and lubricate the emergency cable.
Bleed all brakes thoroughly. Adjust emergency brake.
Change oil and top off anything else.
Change air filter.
Rotate tires and clean them very well, checking pressures, etc.
Detail the engine bay.
Polish the fillers, tail lights and headlights.
Clean the car, do a bit of polishing on the paint. (never been done completely yet since the paint job)
Detail the trims and plastics.
Should about do it for the car.
Also finish up all lighting projects for everyone.

And try to take care of any customers till I leave. :p